Eight service lines
01

Integrated facility management covering full maintenance, energy management, security and safety, and space management.

02

Comprehensive periodic maintenance contracts for commercial and residential complexes, schools and hospitals, on a scheduled visit programme.

03

HVAC installation, maintenance and cleaning · Electrical installation and maintenance · Plumbing installation and maintenance · Drainage and sewer clearing · Water leak detection

04

Post-construction cleaning · Pest control and spraying · Water tank cleaning and disinfection · Floor and ceramic polishing · Steam furniture cleaning · Residential compound cleaning

05

Building finishing · Annexes and branch fit-out · Interior and exterior painting · Roof and tank waterproofing

06

Asset management, periodic inventory and one service standard across your branches throughout the Kingdom.

07

Trained staff across construction, restoration, plumbing, electrical, cleaning, maintenance and operation.

08

Daily operation with preventive and corrective maintenance, a resident team and agreed indicators.

Home › Services › Operation & Maintenance

Operation & Maintenance Company in Saudi Arabia

Operation and maintenance that raises facility readiness and makes responsibility for every task explicit. We coordinate planned preventive maintenance (PPM), corrective works, tickets and reporting within a scope built from the critical assets, the operating hours and the impact of downtime. Services, priorities and outputs are approved per site before delivery begins — whether a single office or a portfolio of branches, stores, warehouses and malls.

This service suits

Start with a single site of defined scope before deciding to expand.

We serve facilities and brands across sectors throughout the Kingdom
Coverage area

We serve client facilities across the Kingdom

Manazel delivers operation and maintenance contracts for facilities across the regions of Saudi Arabia, with a direct operational presence in the two main cities:

Why this model

Move from handling each fault on its own to managing the whole work cycle

An operation and maintenance contract (O&M) is a corporate agreement under which a single provider manages the entire technical work cycle at a facility or across a portfolio of sites: the asset register, the preventive maintenance plan, corrective works, coordination of trades and vendors, the approval path, and periodic reporting.

When the work is split across several parties with no unified scope, it becomes hard to know who is responsible, what the ticket status is, and what recurrence costs. This model ties those elements into one reviewable reference, so the question shifts from “who is responsible for this fault?” to “what is the work-order status and what decision is needed?”

The outcomes above are the operating aims of the model, not numerical guarantees. Actual commitments are set in the proposal and the service level agreement for each contract.

Fewer unplanned works

A preventive plan built on asset criticality

Documented close-out

Every ticket carries a recorded action through to closure

Decisions based on a record

Fault recurrence and recommendations in a report

Operational impact

What changes after contracting operation and maintenance?

The difference is not measured in the number of visits, but in what changes in the facility’s readiness, its record and its budget. This comparison shows the difference item by item.

With scattered contractors
With an O&M contract

Every fault is handled by a separate call-out when it happens

One work cycle from the ticket to a documented close-out

Sudden downtime halts a whole activity without warning

A preventive plan built on critical assets reduces surprises

You do not know which asset consumes more, or why

An asset register and maintenance history supporting repair-or-replace decisions

A contractor per trade and responsibility scattered between them

One provider with a written scope and a known escalation path

The cost of failures appears after they happen, not before

A planned operating cost with approval limits known in advance

The renewal decision rests on the team’s impression

A periodic report setting out recurrence, risks and recommendations

Choosing the model

When to choose operation and maintenance over the alternatives

Your need
Best-fit model
Why

Managing the full technical work cycle at live sites

Operation and maintenance

Ties assets, schedules, tickets, approvals and reporting into one scope

Annual coverage on a fixed budget with commitments set in advance

Annual maintenance contract

Fixes scope, coverage and pricing across a contract year

Specialist technical works in HVAC, electrical and plumbing

Technical building services

Holds the depth needed for technical systems and trades

A broad scope combining technical works, cleaning, vendors and reporting

Integrated facility management

Brings technical and support works under one responsibility

Service scope

Six components built around the facility, not from a ready-made list

1

Asset and needs assessment

Reviewing the available data, the site condition and the critical assets before building any schedule or operational commitment.

2

The preventive maintenance plan

Frequencies built on asset type and criticality, manufacturer recommendations where available, and what is approved contractually.

3

Corrective works management

Receiving, classifying, routing and tracking the ticket through to closure, documenting the action taken.

4

Trade coordination

Managing technical and civil works and vendors within the approved scope and the safety requirements.

5

Materials and additional works

Clarifying what the price covers and what needs prior approval, and the financial authority limits for each type of work.

6

Reporting and operational review

Presenting status, recurrence, risks, recommendations and the decisions required in a regular review cycle.

Priority levels

Priority is set by the impact of the fault, then the times are fixed in the service level agreement

Priority
Definition of impact
How it is handled

Critical

A potential safety impact or a direct halt to activity

Escalation through the emergency channel approved in the contract

High

A core function disrupted with partial operation or a limited workaround

Intensive tracking and updates until it is contained

Routine

Limited impact that can be scheduled without halting activity

Added to the work plan and tracked through to closure

Planned

Inspection, improvement or non-urgent preventive maintenance

Delivered according to the schedule and the approvals in place

Outputs

What does the client receive?

An approved scope of work

Setting out the works included, the exclusions and each party’s responsibility, so no clause is left open to interpretation.

An asset list or reference

Based on the data available at contracting, completed progressively with each field visit.

An approved preventive maintenance plan

Tied to the assets and the agreed schedule, and open to review when usage or asset condition changes.

A register of tickets and work orders

Showing each ticket’s status, the action taken and the close-out time — not merely a list of requests.

An approval path

For materials and additional works within known financial authority limits, so no item outside the price takes you by surprise.

A periodic performance report

In an agreed format setting out what was delivered, the gaps, the recommendations and the decisions required from you.

Would you like to move your facility from firefighting faults to a managed work cycle?
Contracting steps

From the assessment request to service start-up

1
Initial request

Your organisation’s details, the sites and their types, the scope of need and the target start date — with no commitment at this stage.

2
Suitability review

Assessing the available documents, asset and fault records and current contracts to determine what can genuinely be covered.

3
Technical survey

A site visit where needed to assess assets, risks, operating hours and access and safety requirements.

4
Proposal and scope

A technical and commercial proposal setting out the scope, exclusions, responsibilities, service levels (SLA) and the financial approval process.

5
Mobilisation and start-up

Contract approval, the mobilisation plan and team preparation, then service start-up and measurement against the agreed outputs.

Frequently asked questions

What you need to know before requesting an O&M proposal

A corporate agreement under which a single provider manages the entire technical work cycle at a facility or across a portfolio of sites: the asset register, the preventive maintenance plan, corrective works, coordination of trades and vendors, the approval path and periodic reporting. It differs from calling a technician for each fault in that it defines the scope, exclusions, responsibilities, handling priorities and measurement criteria in advance.

Preventive work is scheduled in advance to keep the asset ready and reduce the likelihood of failure, with frequencies built on asset type, criticality and manufacturer recommendations. Corrective work addresses a fault after it appears and is ordered by its operational impact. The contract balances the two according to asset criticality, risk level and operating hours.

The contract names the approval authorities, the value thresholds and the documents required before delivery, except for urgent safety measures which are defined in advance within the scope. The aim is to prevent work being carried out outside the budget without a documented decision.

Coordinating specified vendors can be included if the responsibilities, authorities and data-exchange process are clearly defined in the scope. It is not assumed automatically, because it creates obligations and accountability on both sides.

The sites, their types and cities, the working hours and the coverage required, the services required, asset and fault records if they exist, current contracts with their end dates, and the target start date.

Priority is set by the operational impact of the fault rather than how it is described: a safety impact or a direct halt to activity is treated as critical; a core function disrupted with partial operation is treated as high priority; and a limited, schedulable impact is treated as routine. The actual times are fixed in the service level agreement for each contract.

O&M assessment

Get an initial outline of an O&M contract suited to your facility

Send the critical asset types, the operating hours, the sites and the services required, and we will define the preventive plan, the response times, the service levels and the report format.

Direct contact

The site visit and initial assessment are free and carry no obligation.