Restoration & Refurbishment
Do you need building restoration, finishing and maintenance, or are you fitting out plumbing and electrical, building works, extensions and space reconfiguration? We deliver tailored solutions for residential buildings and commercial projects, with a trained and qualified workforce and the latest equipment and techniques.
- Fitting out new branches and stores
- Refreshing offices and administrative headquarters
- Residential projects and compounds
- Extension works and space reconfiguration
- Restoration and interior finishing
- Waterproofing and painting works
Work begins with a survey and approved quantities and specifications before execution.
From a verbal estimate to approved quantities and specifications before day one
Most disputes in restoration and fit-out work do not arise during execution but before it: an unwritten scope, estimated quantities, and specifications open to two readings. The result is delay and additional works nobody budgeted for.
We start with a survey that produces approved quantities, specifications and acceptance criteria, then a schedule built around your facility’s operating hours so your business is not disrupted during the works.
General contracting that meets the needs of companies and commercial businesses
Building maintenance and restoration
Restoration and maintenance for commercial and residential buildings: renewing walls, maintaining plumbing and electrical systems, building and merging rooms, and treating cracks and fissures.
Exterior painting
Facade treatment and delivery: marble and profile detailing and coloured render, plus painting of building and complex facades, walls and entrance elevations in a layered system that resists sunlight and rain.
Roof waterproofing
Complete protection against water and heat ingress, including waterproofing to stop water penetration and thermal insulation to block heat transfer.
Annexes and majlis construction
Construction of residential annexes, commercial projects and outdoor majlis areas, with roof tiling and complete fit-out.
Interior painting
Interior wall painting in distinctive colours, and repainting of rooms and offices at reasonable rates.
How we manage the project
Survey and assessment
An engineer inspects the structural condition and the technical systems before any price is given.
Condition report
Separates what must be repaired, what we recommend, and what is an optional improvement.
An itemised quotation
Every item with its quantity and price, so you can remove or defer whatever you choose.
The programme
Clear stages and durations with a commitment to the agreed dates, and advance notice of any work affecting operations.
Supervised execution
A Manazel site supervisor monitors quality and safety daily, with periodic progress reports documented with photographs.
Handover and warranty
Handover against agreed criteria, with a snagging period and a written warranty on the works delivered.
The correct order of execution
We hold to a fixed order in restoration work, because bringing any stage forward means redoing it later: we start by treating causes — leaks, damp, cracks and roof waterproofing — then the concealed systems of plumbing, electrical and HVAC with testing before they are covered, then the surfaces of render, gypsum and flooring, and finally the visible finish of paint, doors and fittings.
Browse the contracting services we deliver
Building finishing for facilities and branches: ceramic, tiling, flooring, gypsum, decor and lighting.
Fitting out new branches and extensions and building annexes for facilities, on a staged programme that holds the opening date, with approved quantities and specifications before day…
Interior and exterior painting for facilities and branches, treating damp and cracking before coating and working in phases without halting operations in…
Water and thermal insulation for roofs, tanks and bathrooms in facilities, with testing before the protection layer is laid and detailing at outlets and corners…
What you need to know before restoration and fit-out works begin
After a survey producing approved quantities and specifications, then an itemised quotation: every item with its quantity and price. That lets you remove or defer an item without repricing the whole project. Any lump sum given before the survey is an estimate, not a commitment.
Yes. An engineer inspects the structural condition and the technical systems and issues a report separating what must be repaired immediately, what we recommend, and what is an optional improvement. That separation protects you from paying for cosmetic work presented as necessity.
It depends on the area, the volume of work, material availability and the target opening date. The programme is built in clear stages and durations after the scope is approved, and is committed to contractually with advance notice of any work affecting operations.
Yes in most cases. Disruptive works are scheduled outside operating hours or delivered in phases that isolate the work area from staff and customer routes. The schedule is agreed before start-up because working during operations requires different safety arrangements.
Work is handed over against acceptance criteria agreed in advance, with a snagging period and a written warranty on the works delivered whose duration and scope are set in the contract. A verbal warranty cannot be claimed, so it is always documented.
At the survey stage we set out what permits or approvals the work requires from the owner, the complex management or the competent authorities, and who obtains them. Assigning that responsibility early prevents the project stalling halfway.
Approved scope, quantities and specifications before execution begins
Send the project type, its location, the works required and the target duration, and we will determine the survey needed and prepare the quantities, specifications, delivery programme and acceptance criteria.
The site visit and initial assessment are free and carry no obligation.